We tile bathrooms, floors, pools, terraces and natural stone across 10 Bali areas — screed levelled first, membrane under every wet room, adhesive matched to where the tile will live. Labour from IDR 130,000/m², free site visit and a fixed quote before we start, 12 months on our workmanship. Send your m² and a photo on WhatsApp. From October–November, the wet season, we move to interior and covered tiling and keep terraces and pool surrounds for dry days.
A ceramic floor, a shower wall and a mosaic-lined pool are three different trades wearing one name. Bathroom tiling starts with a membrane, floor tiling with a level screed, pool tiling with a sound, dry shell, terrace tiling with a drainage fall and natural stone installation with the right stone for the spot. Tile repair starts with finding the cause. Get the start right and the tiles sit flat for a decade — skip it and they pop inside a year.

Walls and floors with waterproofing membrane. Correct slope to drain, clean grout lines. The kind of work that holds up in Bali's humidity.
Learn more →
Indoor and outdoor floors. Porcelain, ceramic, natural stone. Correct substrate prep, expansion joints, anti-slip spec for wet areas.
Learn more →
Pool mosaic and ceramic with waterproof adhesive and pool-grade grout. We've done plenty of Bali villa pools — we know what fails and why.
Learn more →
Anti-slip tiles for terraces, pool decks and entrance areas. Exterior adhesive, correct drainage slope, rated for Bali's rain and sun.
Learn more →
Hollow tiles, cracks, failed grout — we find the cause before replacing. Otherwise the new tile has the same problem in six months.
Learn more →Natural stone — marble, travertine, andesite, limestone, paras — needs its own adhesive, cutting and sealing. Natural stone installation →
Ask About StoneChoose the tiling job, your area and a day that suits — WhatsApp opens with everything pre-filled, you press send, and we come straight back with a confirmed slot.
Nothing to pay at this stage — the message lands in our WhatsApp with your details, and we answer with a firm time and the labour rate.
Every callback we get to rescue someone else's tiling traces back to one of six skipped steps. Here is what we refuse to skip.
Bali's wet season usually settles in from November and runs to March. Exterior adhesives, grout and pool waterproofing need dry days to cure, so October is the last comfortable month for terraces and pool decks and for draining and re-tiling a pool. Outdoor work in the wet months is still possible, but it means tarpaulins, longer curing and flexible dates.
Indoor jobs are not seasonal: bathrooms, floors and natural stone run all year. If the villa must be ready for December–January bookings, book the site visit now — send the m² and a few photos on WhatsApp and we propose dates. Labour rates are on the pricing page.
Each material has different adhesive, cutting and sealing requirements. We know them all.
Labour prices. Materials (tiles, adhesive, grout, membrane) quoted separately.
| Work | Labour (IDR/m²) | Notes |
|---|---|---|
| Floor tiling — straight lay | from 130,000 | Ceramic or porcelain |
| Floor tiling — diagonal / pattern | from 180,000 | More cuts, more time |
| Bathroom wall tiling | from 150,000 | Waterproof membrane included |
| Natural stone installation | from 210,000 | Marble, travertine, limestone |
| Pool tiling | from 230,000 | Waterproof adhesive + pool grout |
| Mosaic installation | from 320,000 | Small format, high precision |
| Tile repair (per tile) | from 350,000 | Call-out and root cause check included |
Minimum job: 5m². Free site visit to assess and quote. Full pricing → · Harga jasa pasang keramik (Bahasa Indonesia) →
"Tiled our 3 bathrooms and the terrace. Clean work, everything flat, grout lines consistent. Six months later, not a single hollow tile."
"Re-tiled our pool with mosaic. They drained it, assessed the substrate, fixed some hollow sections first, then tiled. Looks perfect, no issues after 8 months."
"Previous tilers skipped the waterproofing. Tiles started coming up after 18 months. These guys did it properly — membrane, correct adhesive, the lot. No problems since."