Looking for a tiler in Bali who preps before he lays? We handle bathroom tiling, floor tiling, pool tiling and natural stone across the island — substrate levelled first, wet rooms sealed before the first tile goes down, adhesive matched to where the tile will actually live.
A ceramic floor, a shower wall and a mosaic-lined pool are three different trades wearing one name. Bathroom tiling starts with a membrane, floor tiling starts with a level screed, and pool tiling starts with a sound, dry shell. Get the start right and the tiles sit flat for a decade — skip it and they pop inside a year.

Walls and floors with waterproofing membrane. Correct slope to drain, clean grout lines. The kind of work that holds up in Bali's humidity.
Learn more →
Indoor and outdoor floors. Porcelain, ceramic, natural stone. Correct substrate prep, expansion joints, anti-slip spec for wet areas.
Learn more →
Pool mosaic and ceramic with waterproof adhesive and pool-grade grout. We've done plenty of Bali villa pools — we know what fails and why.
Learn more →
Anti-slip tiles for terraces, pool decks and entrance areas. Exterior adhesive, correct drainage slope, rated for Bali's rain and sun.
Learn more →
Hollow tiles, cracks, failed grout — we find the cause before replacing. Otherwise the new tile has the same problem in six months.
Learn more →Natural stone — marble, travertine, andesite, limestone — has different installation requirements. Ask us about your specific material.
Ask About StoneChoose the tiling job, your area and a day that suits — WhatsApp opens with everything pre-filled, you press send, and we come straight back with a confirmed slot.
Nothing to pay at this stage — the message lands in our WhatsApp with your details, and we answer with a firm time and the labour rate.
Every callback we get to rescue someone else's tiling traces back to one of six skipped steps. Here is what we refuse to skip.
Mid-August finds Bali deep in the dry season, and for tiling crews this is the best working window of the year. Exterior adhesives and grouts reach full strength when a terrace stays rain-free for days on end, so most of our outdoor and terrace laying is scheduled now — and it is also the season villa owners drain and re-tile pools, since pool tiling needs a dry shell before immersion-rated adhesive can go on. Try the same jobs in the wet months and curing slows, tarpaulins go up, and timelines stretch. August needs none of that.
Crews are taking September dates across Canggu, Seminyak, Sanur and the Bukit now. If a pool interior, an outdoor floor or a guest bathroom should be finished before the December–January holiday rush, this is the month to lock a date. Labour rates are on the pricing page — send your m² over WhatsApp and we'll slot you in.
Each material has different adhesive, cutting and sealing requirements. We know them all.
Labour prices. Materials (tiles, adhesive, grout, membrane) quoted separately.
| Work | Labour (IDR/m²) | Notes |
|---|---|---|
| Floor tiling — straight lay | from 90,000 | Ceramic or porcelain |
| Floor tiling — diagonal / pattern | from 130,000 | More cuts, more time |
| Bathroom wall tiling | from 120,000 | Waterproof membrane included |
| Natural stone installation | from 150,000 | Marble, travertine, limestone |
| Pool tiling | from 200,000 | Waterproof adhesive + pool grout |
| Mosaic installation | from 250,000 | Small format, high precision |
| Tile repair (per tile) | from 150,000 | Includes root cause check |
Minimum job: 5m². Free site visit to assess and quote. Full pricing →
"Tiled our 3 bathrooms and the terrace. Clean work, everything flat, grout lines consistent. Six months later, not a single hollow tile."
"Re-tiled our pool with mosaic. They drained it, assessed the substrate, fixed some hollow sections first, then tiled. Looks perfect, no issues after 8 months."
"Previous tilers skipped the waterproofing. Tiles started coming up after 18 months. These guys did it properly — membrane, correct adhesive, the lot. No problems since."